SDFManuals

Scheduled Maintenance

DORADO 80

Serial Number: ZKDFZ80200TS50001
€25

This document in other languages

SKU: SAME.M.FZ8.406f57c3b5c8.en Category:

Scheduled Maintenance for SAME DORADO 80 → ZKDFZ80200TS50001 from the DORADO (FARMOTION STAGE 3B) family. Digital PDF in English with 46 pages.

SKU: SAME.M.FZ8.406f57c3b5c8.en
Category:

Document overview

Scheduled Maintenance for SAME DORADO 80 → ZKDFZ80200TS50001 from the DORADO (FARMOTION STAGE 3B) family. Digital PDF in English with 46 pages.

The schedule contains 8 maintenance packages and 220 operations, plus 46 spare-part lines and 47 consumable-material lines.

Main sections included

  • 1st service
  • Service intervals

Document details

  • Brand: SAME
  • Family: DORADO (FARMOTION STAGE 3B)
  • Model: DORADO 80
  • Starting serial number: ZKDFZ80200TS50001
  • Document type: Scheduled Maintenance
  • Language: English
  • Pages: 46
  • File size: 3.57 MiB
  • Format: Digital PDF download

Compatibility

Before purchasing, verify that your machine model and reference code match SAME DORADO 80 → ZKDFZ80200TS50001.

Complete table of contents

  • 1st service
    • A0100 — At 100 hours – 1st service (100 hours / 0 months)
  • Service intervals
    • E0010 — Every 10 operating hours or daily (10 hours / 0 months)
    • E0050 — Every 50 hours (50 hours / 0 months)
    • E0301 — Every 300 hours (300 hours / 0 months)
    • E0601 — Every 600 hours (600 hours / 0 months)
    • E1201 — Every 1,200 hours or every year (1200 hours / 12 months)
    • E2400 — Every 2,400 hours or two years (2400 hours / 24 months)
    • E4800 — Every 4.800 hours or four years (4800 hours / 48 months)