SDFManuals
€110

This document in other languages

SKU: LAM.W.38.93db1e38702c.en Category:

Workshop Manual for LAMBORGHINI 1000.3 WTI Stage 3A from the Tractor components – Engine – SLH Stage 1-2-3A family. Digital PDF in English with 157 pages.

SKU: LAM.W.38.93db1e38702c.en
Category:

Document overview

Workshop Manual for LAMBORGHINI 1000.3 WTI Stage 3A from the Tractor components – Engine – SLH Stage 1-2-3A family. Digital PDF in English with 157 pages.

The corresponding English table of contents contains 5 sections and 64 individual topics.

Main sections included

  • Introduction
  • Technical characteristics
  • Method of intervention

Document details

  • Brand: LAMBORGHINI
  • Family: Tractor components – Engine – SLH Stage 1-2-3A
  • Model: 1000.3 WTI Stage 3A
  • Document type: Workshop Manual
  • Language: English
  • Pages: 157
  • File size: 59.65 MiB
  • Format: Digital PDF download

Compatibility

Before purchasing, verify that your machine model and reference code match LAMBORGHINI 1000.3 WTI Stage 3A.

Complete table of contents

  • Introduction
    • Introduction – Engines
    • Tightening Torques
    • Identification of the engine type and serial number position, Europe version
    • Identification of the engine type and serial number position, EPA version
    • Identification of the injection pump type
    • Identification of the injector type
    • Injector type identification
  • Technical characteristics
    • Engine
      • Engine block technical data
      • Crankshaft technical data
      • Technical data for pistons – Piston rings
      • Connecting rod technical data
      • Camshaft technical data – static advance of 12°
      • Timing gears technical data
      • Technical data and dimensions of valves – valve springs
      • Technical data and dimensions of cylinder heads – valve guide – valve seats
      • Technical data and dimensions of rocker arms – rocker shafts – tappets
      • Engine injectors technical data
      • Hydraulic tappets diagram
  • Method of intervention
    • B0 – Engine
      • Preliminary disassembly operations
      • Checking engine block
      • Crankshaft
      • Crankshaft checks
      • Flywheel checks
      • Renewal of crankshaft rear oil seal
      • Pistons and cylinder liners
      • Pistons and rings check
      • Cylinder liners check
      • Check connecting rods – gudgeon pins – rod cap screws
      • Camshaft checks
      • Camshaft
      • Valve timing
      • Timing gear checks
      • Adjusting timing gears backlash
      • Valves check
      • Valve seats check
      • Valves sealing check
      • Adjusting valve clearance
      • Valve guides check and replacement
      • Inspecting the rocker arms and rocker shafts
      • Cylinder heads
      • Determining correct head gasket thickness
      • Valve springs check
      • Heat exchanger removal
      • Lubrication pump
      • Lubrication pump disassembly
      • Oil sump
      • INJECTION PUMPS, GOVERNOR AND FUEL SUPPLY
      • Synchronising injection pumps
      • Injectors assembly
      • Checking injectors protrusion – Renewal of copper bushes
      • Injectors check
      • Injection pump control rod
      • Overhaul of the mechanical governor (standard and with LDA valve)
      • Electronic governor adjustment
      • Installation of electronic governor support
      • Engine coolant pump
      • Engine coolant pump
      • Thermostatic valve
      • Checking the thermostat valve
      • Cooling and intake ducts
      • Final engine checks
      • Final refitting operations
      • Pulley hub fixing (for types without front PTO)
      • Pulley hub fixing (for types with front PTO)