SDFManuals

Scheduled Maintenance

Strike CM 105

Serial Number: ZKDFF81500TL10001
€25

This document in other languages

SKU: LAM.M.FF8.c77108897328.en Category:

Scheduled Maintenance PDF for LAMBORGHINI Strike CM 105 → ZKDFF81500TL10001, STRIKE C (FARMOTION STAGE 3B) family. Document language: English; 34 pages.

SKU: LAM.M.FF8.c77108897328.en
Category:

Document overview

Scheduled Maintenance PDF for LAMBORGHINI Strike CM 105 → ZKDFF81500TL10001, STRIKE C (FARMOTION STAGE 3B) family. Document language: English; 34 pages.

The schedule contains 8 maintenance packages and 162 operations, plus 33 spare-part lines and 35 consumable-material lines.

Main sections included

  • 1st service
  • Service intervals

Document details

  • Brand: LAMBORGHINI
  • Family: STRIKE C (FARMOTION STAGE 3B)
  • Model: Strike CM 105
  • Starting serial number: ZKDFF81500TL10001
  • Document type: Scheduled Maintenance
  • Language: English
  • Pages: 34
  • File size: 4.06 MiB
  • Format: Digital PDF download

Compatibility

Before purchasing, verify that your machine model and reference code match LAMBORGHINI Strike CM 105 → ZKDFF81500TL10001.

Complete table of contents

  • 1st service
    • CA0100 — At 100 hours – 1st service (100 hours / 1 months)
  • Service intervals
    • CE0010 — Every 10 operating hours or daily (10 hours / 0 months)
    • CE0050 — Every 50 hours (50 hours / 0 months)
    • CE0301 — Every 300 hours (300 hours / 3 months)
    • CE0601 — Every 600 hours (600 hours / 6 months)
    • CE1201 — Every 1,200 hours or every year (1200 hours / 12 months)
    • CE2401 — Every 2,400 hours or two years (2400 hours / 24 months)
    • CE4801 — Every 4.800 hours or four years (4800 hours / 48 months)