SDFManuals

Scheduled Maintenance

XB MAX 85

Serial Number: ZKDL2302W0TH20001
€25

This document in other languages

SKU: HURL.M.L23.e67a28bc632a.en Category:

Scheduled Maintenance PDF for HURLIMANN XB MAX 85 → ZKDL2302W0TH20001, XB MAX (STAGE 3A) family. Document language: English; 22 pages.

SKU: HURL.M.L23.e67a28bc632a.en
Category:

Document overview

Scheduled Maintenance PDF for HURLIMANN XB MAX 85 → ZKDL2302W0TH20001, XB MAX (STAGE 3A) family. Document language: English; 22 pages.

The schedule contains 5 maintenance packages and 93 operations, plus 13 spare-part lines and 31 consumable-material lines.

Main sections included

  • 1st service
  • Service intervals

Document details

  • Brand: HURLIMANN
  • Family: XB MAX (STAGE 3A)
  • Model: XB MAX 85
  • Starting serial number: ZKDL2302W0TH20001
  • Document type: Scheduled Maintenance
  • Language: English
  • Pages: 22
  • File size: 3.71 MiB
  • Format: Digital PDF download

Compatibility

Before purchasing, verify that your machine model and reference code match HURLIMANN XB MAX 85 → ZKDL2302W0TH20001.

Complete table of contents

  • 1st service
    • A0100 — At 100 hours – 1st service (100 hours / 0 months)
  • Service intervals
    • E0010 — Every 10 operating hours or daily (10 hours / 0 months)
    • E0250 — Every 250 hours (250 hours / 0 months)
    • E0500 — Every 500 hours (500 hours / 0 months)
    • E1000 — Every 1,000 hours or every year (1000 hours / 12 months)